Seattle Public Schools

Robert Eagle Staff Middle School

1330 N 90th St.
Seattle, WA 98103
About Eagle Staff
Office Phone: 206-413-2300
Fax: 206-413-2301
Office Email: eaglestaff@jsgqp.com

Eagle Staff School Profile

Attendance Area School Attendance Area Map

School Leadership and Board District

Community Partners at Eagle Staff Community resources and programs at Eagle Staff Middle School


Continuous School Improvement Plan (C-SIP)

Robert Eagle Staff Middle School C-SIP

学校持续改善计划(C-SIP)是每所学校的行动计划 它确定了学校在当前和即将到来的学年计划重点关注的领域, the performance goals they want students to achieve, and how the school plans to collaboratively meet these goals.

这些计划会定期更新,以反映每所学校正在使用的策略. 这个文件也可以作为我们的标题I学校全校范围内的改进计划.


School and Building Reports

School Report

Robert Eagle Staff Middle School Report

School Reports show a brief snapshot of a school’s academic growth, student climate, accountability, family and staff engagement, and overall school performance. 学校报告由州公共教育监督办公室为该州的每个学校和地区制作,并在全年定期更新数据.

On state assessments, students who are expected to participate but do not, such as absences or opting out, are counted as non-proficient. This may affect the school’s overall proficiency rating.

Questions about school reports? Contact the Research and Evaluation Department research@jsgqp.com.

School Climate Surveys

Robert Eagle Staff School Climate Survey

School Climate Surveys are used for school-level improvements, climate surveys are given to all staff, students, and families each year. The staff and student surveys are given to respective groups in person at schools; the family survey occurs in the spring.

Building History

Robert Eagle Staff Building History and Information

Asbestos Hazard Emergency Response Act (AHERA)

Due to the age of the building or previous asbestos abatement projects, 没有已知的含石棉建筑材料(ACBM)在罗伯特·伊格尔员工大楼. 如发现任何可疑物质,请通知下列石棉指定人员.

As required under AHERA, 罗伯特·伊格尔教职员中学必须保持石棉管理计划(AMP),并将其存档在学校. The AMP is available for review during school hours, Monday through Friday.

Wendy Couture
Environmental Health and Safety Manager
wjcouture@jsgqp.com
206-252-0528


Discipline Dashboard

As part of Seattle Excellence, Seattle Public Schools’ Strategic Plan, 该地区致力于中断不合比例的纪律做法. To support this work and to increase transparency and accountability, 该学区为每所学校创建并发布了面向公众的纪律指示板,并于11月1日发布, 2021.

纪律仪表板数据反映了当前学年,并将在整个学年每季度更新一次. 如有任何疑问或疑虑,请联系具体学校的学校领导.

Academic Year: Current academic school year.
Accessible/Default: Click here to switch to an accessible version of the dashboard.
Actions by Month: Count of disciplinary actions by month and exclusion type.
Actions: Count of disciplinary actions for an exclusion type.
Attribute:学生属性(性别,种族/民族,所服务的特殊教育,504计划)
Days: Count of exclusion days for an exclusion type.
Days of Exclusion: Count of exclusion days.
Discipline Rate:至少有一次违纪事件的学生人数除以所有在校生人数.
E. Expulsions: Count of emergency expulsions for a student attribute.
Enrolled: Count of enrolled students.
Exclusion Actions: Count of exclusionary actions for a student attribute.
Exclusion Days: Count of exclusion days for a student attribute.
Exclusion Type: Short-term suspension (SS), Long-term suspension (LS), Emergency expulsion (EE), In-school suspension (IS), Expulsion (EX), and Interim alternative education setting (IA).
Exclusionary Actions: Count of exclusionary actions.
Expulsions: Count of expulsions for a student attribute.
FERPA Compliance: Family Educational Rights and Privacy Act Compliance. *
Incidents by Day of Week: Count of disciplinary actions by day of week.
Incidents by Grade: Count of disciplinary actions by grade.
Incidents by Hour: Count of disciplinary actions by hour.
Incidents by Exclusion Type: Count of disciplinary incidents for an exclusion type.
Incidents by Student Attribute or Support Service: Count of disciplinary incidents. Incidents are counted as many times as there are students involved.
Incidents per 100 Students:违纪事件数除以在校生数,再乘以100. Incidents are counted as many times as there are students involved.
Rate: Discipline rate for an exclusion type.
School Name: School name.
Students: Count of students with at least one disciplinary incident.
Suspensions: Count of suspensions for a student attribute.
Weapons: Count of disciplinary incidents in which a weapon was involved.

* Please note: When a group has fewer than 10 enrolled students, all values for at least the two smallest groups are suppressed.

Robert Eagle Staff Levy Projects

BEX IV

以前构成威尔逊太平洋校区的建筑被拆除,取而代之的是新的卡斯卡迪亚小学建筑和新的罗伯特鹰教工中学建筑. LIcton Springs K-8学校占据了新中学大楼的一侧. The new school buildings opened Fall 2017.

Levy Approved : 2013

Project Description

The previously existing 110,000-square-foot, 1950年代威尔逊太平洋学校的建筑被拆除,为新学校让路. The Native American murals by artist Andrew Morrison were detached, stored and reinstalled as part of construction of the new buildings. 新校区被设计成一所小学、一所中学和一所K-8学校. 它包括一个中央合成草皮运动场,有一条步道,还有足球场和垒球场,也为社区田径提供服务.

新的Robert Eagle Staff中学作为西雅图西北部的一所新中学开放. The school building, which will hold up to 850 middle school students, 由三层教室两翼组成,以优化被动太阳能朝向和日光进入教室. 学校包括各种灵活组织的学习环境,可以随着时间的推移而改变. 这将使罗伯特·伊格尔教职员中学能够以各种方式支持所有学生,以消除机会差距. 教室群围绕着一个共享的学习公共空间配置,通过室内窗户墙为小组提供监督空间. Multiple science labs support a variety of program configurations. The central wing includes “makerspace” labs and an arts studio.

The commons, located in the heart of the school, has been designed to accommodate presentations and performances, as well as gathering and dining. 邻近的舞台将容纳典型的中学乐队和合唱团表演, with room for an audience of up to 700. The library features multiple spaces for large or small groups. 图书馆附近的“创客空间”扩展了可用活动的范围,包括使用清洁技术的设计和制造. 声乐和器乐室由几个较小的练习室支持. The gym has a full-size competition basketball court for community use. Using the bleachers and other seating on the floor, the space can accommodate whole-school events or assemblies.

中学包括一个面向东方的室外庭院,用于娱乐和聚会, 这里有精心保存和重新安装的美洲原住民壁画,还有一个荣誉圈,庆祝该遗址的历史,以及利克顿泉对美洲原住民的文化意义.

Sustainability Features

两座学校建筑都将采用预制混凝土板和纤维水泥板墙, 由钢框架支撑的外部外壳的玻璃和膜屋顶.

About BEX

卓越建筑(BEX)资本征费用于资助现代化或更换老旧建筑物的项目, fund technology for student learning, 处理整个地区的地震和安全问题以及主要的预防性维护需求.

2013年,超过72%的西雅图选民通过了BEX IV资本税.BEX V资本税将取代即将到期的税收,并将于2019年2月在选民面前进行投票.

BTA III

In February 2010, the $270M, six-year capital Levy, Buildings, Technology and Academics III (BTA III), garnered support from 73.45 percent of those voting in the Levy election. It was a renewal of the Buildings, Technology and Athletics (BTA II) Levy, passed by voters in February 2004.

  • 2011 : Installed energy-conserving fan and pump motors at Wilson-Pacific.

BTA II

In 2004, Seattle voters approved the BTA II capital Levy. 该基金资助了该地区每所学校近700个设施改善项目和技术升级. 

  • 2012 : Replaced boiler burners to improve energy efficiency at Wilson-Pacific.

BTA I

The $150 million Buildings, 科技及学术/体育(BTA I)资本征款于一九九八年二月获投票通过. BTA I在该市的每所学校资助了超过465个大小设施项目. The projects included safety and security upgrades, roof and window replacements and technology and athletic field upgrades.

  • 2001 : Athletic field at Wilson-Pacific
  • 1999 : Reroofing at Wilson-Pacific

About BTA

The Buildings, 技术和学术(BTA)资本税支持该地区的长期计划,以升级和翻新老化的学校设施,并解决入学人数增长问题.

The BTA IV Capital Levy was approved by voters in 2016. Seattle Public Schools will receive these Levy funds from 2017 through 2022.

Enroll at Robert Eagle Staff